Table of Contents
Instructions
- Analyze the hazards associated with the roofing and the interior work. You should identify at least three hazards for each activity.
- Perform a risk assessment on three of the hazards that you identified for each activity (six total) using the 4 X 5 matrix shown in Figure 34-1 on page 492 of the textbook or in the quantitative risk assessment form, which can be accessed by clicking here .
- Prioritize the need for controls for the hazards that you selected based on the results of the risk assessment.
- Using the hierarchy of engineering controls listed in Figure 3-3 on page 29 of the textbook, recommend a control method for each hazard that you believe would be the most effective in reducing risk to an acceptable level. Explain why you made the choice, and support your decisions with at least one reference other than the textbook.
- Use the 4 X 5 matrix or the quantitative risk assessment form to show the reduction in risk for each hazard after the control method has been applied.
- For any fall protection that you recommend, be specific about the type of fall protection needed.
- Discuss how Prevention through Design (PtD) could be used to reduce the risks associated with these operations.
What Students Are Saying About Us
.......... Customer ID: 12*** | Rating: ⭐⭐⭐⭐⭐"Honestly, I was afraid to send my paper to you, but you proved you are a trustworthy service. My essay was done in less than a day, and I received a brilliant piece. I didn’t even believe it was my essay at first 🙂 Great job, thank you!"
.......... Customer ID: 11***| Rating: ⭐⭐⭐⭐⭐
"This company is the best there is. They saved me so many times, I cannot even keep count. Now I recommend it to all my friends, and none of them have complained about it. The writers here are excellent."